Residential paving.

Are you in need of a new  parking lot? Looking to upgrade your condominium roadway or parking lot? Go Asphalt has great experience in rehabilitating old pavement surfaces into new parking lot designs.

Deteriorating parking lots could be a result of incorrect construction, subsidence, flooding, invading tree roots, solvent spillage and age; to name but a few. We will evaluate the condition of your parking lot and provide recommendations for your project.

Go Asphalt can enhance your property with an attractive and functional roadway that will last for years to come. We would love to show you both the quality and affordability of our work first hand, so call us today at (780) 686-5700 for a complimentary evaluation and quotation.

OUR SERVICES

 

+ Roadway Design & Construction

+ Roadway Rehabilitation & Cement Stabilization
+ Roadway Resurfacing
+ Parking Lot Paving
+ Parking Lot Excavation & Subgrade Preparation

To learn more about our residential paving services, call (780) 686-5700 to speak to a project manager now, or Request a Quote.

The Process.

A professional estimator of Go Asphalt will survey the proposed area, assess its soil condition, stability, elevation and any water drainage issues. We will then be able to issue recommendations towards the work to be completed.

Depending on the soil content, any clay or inappropriate material will be excavated to a depth of 30-60cm, geotextile materials will be installed and the area will be backfilled and compacted with new aggregate. If the soil already has a solid gravel base, appropriate compaction will be achieved.

Once the base work completed, the surface will be paved using 75-100mm of hot-mix asphalt and compacted properly.

NEW DRIVEWAY

At first, we will determine if the existing pavement surface has deteriorated due to its age, poor base condition or poor prior concrete and asphalt application. Clay, dirt and high humidity in the soil will involve some base work to be completed prior to paving.

Once any base work completed, the surface will be cleaned and a bonding agent will be applied on the existing pavement. The surface will be paved using 50-100mm of hot-mix asphalt and compacted properly.